Solution Development

The system configuration is selected according to the threat level and
the facility’s operational requirements

1

Threat and impact
scenario analysis

2

Design of the layout
and protection zones

3

Selection of AEGIS Cascade
panel configuration

4

Integration into existing infrastructure

5

System support and
adaptation

Protection System Configuration

AEGIS Cascade S1

Fragmentation Panel

Light fragment protection

AEGIS Cascade S2

Ballistic Panel

Protection against large fragments

AEGIS Cascade S3D

Anti-Drone Panel

Maximum protection against UAV threats

ENGINEERING ADAPTATION

Configuration Adaptation to the Threat Level

AEGIS Cascade configurations and panel composition are selected according to the application scenario, facility architecture, and expected impact level. The system can be adapted to threats posed by unmanned platforms with a payload of up to 120 kg, taking into account protection zone requirements, placement type, and the required level of structural resilience

Warhead up to 10 kg
Warhead up to 40 kg
Warhead up to 75 kg

← From baseline to maximum protection level →

Advantages

NG Fire Rating

The products have an NG fire rating (non-combustible)

All-Weather Performance

The structure is designed for operation in rain, snow, and wind loads, as well as under temperature fluctuations, without loss of performance

Reliability

Durable materials, a well-engineered fastening scheme, and resistance to external impacts ensure stable system operation in real-world conditions

Modularity

The system is assembled from individual panels and sections, making it possible to configure protection for different facilities and zones

Adaptability

The panel composition, layout scheme, and level of protection are selected for a specific facility, threat type, and operating requirements

Maintainability

Damaged panels and structural elements can be replaced quickly without dismantling the entire system or stopping facility operations

CONTACT US

Does your facility need protection?

Contact us to discuss your project, define facility parameters, and select the right
AEGIS Cascade system configuration for your requirements

© All rights reserved. Any copying or use of materials from this website without the copyright holder’s written permission is prohibited